AC directs for timely completion of constant work of Chhitar Bridge  

0

NASEERABAD (APP): Commissioner Naseerabad Division Bashir Ahmed Banglazai Deputy Commissioner Naseerabad Ayesha Zehri, Assistant Commissioner Chhitra Khadim Hussain Khosa inspected the construction work of Chhitra bridge which was destroyed by flood.
Due to the absence of a bridge, the residents of this area are facing severe problems, forcing people to take long distances and take alternative routes.
Assistant Commissioner said that government has started the construction of a new bridge in order to resolve these problems of the people soon.
It should be noted that the Chhitra bridge could not be saved from the devastating flood of 2022.
Assistant Commissioner Khadim Hussain Khosa also gave orders to complete the construction work of the bridge as soon as possible so that the sufferings of the people could be reduced saying that where the government was working on the welfare of the flood victims.
It is also following a solid strategy to compensate the damages caused by the flood so that the people can benefit from the government’s measures, he said.
The construction work of the bridge is being appreciated by the public in the area.

Leave A Reply

Your email address will not be published.