Deputy Commissioner Azhar Ali assures construction will remain halted until inter-provincial consultation addresses flood risk concerns
JACOBABAD (6 AM Report): Deputy Commissioner Jacobabad Azhar Ali has assured Balochistan authorities that the provincial government’s concerns over the controversial Jacobabad Sim Drain project will be given due consideration and that construction work will remain suspended until a No Objection Certificate (NOC) is obtained from the Government of Balochistan and mutual consultations are completed. He gave the assurance during a meeting with Deputy Commissioner Jaffarabad Khalid Khan and Superintending Engineer, Irrigation Circle Naseerabad, Mudassir Zafar Khoso, who briefed him on the potential flood risks the project could pose to several districts in Balochistan.
Inter-Provincial Meeting Reviews Disputed Drain Project
The meeting marked an important development in the dispute over the proposed drainage project in Sindh, which Balochistan officials argue could significantly increase flood risks for downstream areas.
During the briefing, Superintending Engineer Mudassir Zafar Khoso stated that the Main Hairdin Drain already lacked sufficient capacity to discharge Balochistan’s own floodwater. He warned that diverting water from the proposed Jacobabad Sim Drain into the channel could expose the districts of Sohbatpur, Jaffarabad and Usta Muhammad to severe flooding and extensive damage.
He emphasized that the Sindh government should not proceed with the project without first obtaining a formal NOC from the Government of Balochistan.
Jaffarabad Administration Highlights Potential Impact
Deputy Commissioner Khalid Khan also briefed the meeting on the likely consequences of the project for Balochistan’s flood management system and surrounding communities.
Executive Engineer Irrigation Drainage Jacobabad Muazzam Ali and Sub-Divisional Officer Irrigation Drainage Abid Ali Khoso also attended the meeting.
Responding to the concerns, Deputy Commissioner Azhar Ali assured the Balochistan delegation that construction on the disputed Sim Drain would be stopped immediately and would only resume after obtaining the Government of Balochistan’s NOC and completing mutual consultations between the two provincial governments.


