QUETTA | The Balochistan High Court (BHC) has ordered a comprehensive traffic survey of Quetta’s busy Joint Road to identify obstacles to smooth traffic flow and assess measures needed to address congestion.
Advocate General appointed survey committee convener; court seeks details of roadside shops and action over failure to provide complete road expansion PC-I
A division bench comprising Chief Justice Muhammad Kamran Khan Mulakhail and Justice Muhammad Najamuddin Mengal issued the directives while hearing a case concerning traffic management and a proposed filling station along Joint Road.
The court directed the Balochistan Traffic Engineering Bureau to conduct the survey in the presence of representatives from the Advocate General’s Office, Pakistan Railways and the petitioner. The Advocate General was appointed convener of the survey committee.
During the hearing, the bench examined concerns that shops located opposite the proposed filling station were affecting traffic movement.
The court also directed the Quetta Metropolitan Corporation and relevant revenue authorities to submit detailed reports on shops situated along both sides of Joint Road to help identify potential obstructions and assess the existing road layout.
The petitioner’s counsel submitted objections to reports previously filed by the Commissioner of Quetta Division and Pakistan Railways.
Pakistan Railways informed the court that the Railway Estate Development and Marketing Company (REDAMCO) had sought permission to establish a filling station on the eastern side of Joint Road.
The bench further directed appropriate action over the failure to provide the complete PC-I document for the proposed Joint Road expansion project.
The High Court extended its existing interim order until the next hearing and instructed the concerned authorities to comply with its directives.


