NASEERABAD (6 AM Report): Superintending Engineer Irrigation Circle Naseerabad Division Mudassir Zafar Khosa halted construction work on a controversial drainage channel being built within Balochistan’s territorial limits without obtaining a No Objection Certificate (NOC) from the provincial government.
The irrigation official reached the site and ordered machinery to stop the ongoing construction work. According to irrigation authorities, the Sindh government allegedly intends to divert excess water from its agricultural lands into the Hairdin Drainage System through the disputed channel.
Officials warned that the addition of water from Sindh could increase the risk of flooding in Balochistan’s Sohbatpur, Jaffarabad and Usta Muhammad districts, particularly during pre-monsoon rains and periods of heavy drainage flows.
Mudassir Zafar Khosa said the Hairdin Drainage System already has limited capacity to discharge water from Balochistan, and adding additional water from Sindh could worsen the situation. He made it clear that the project would not be allowed to proceed without consultation with the Balochistan government and a formal NOC.
He recalled that during the 2010 super floods, the diversion of floodwaters and cuts made at various locations caused extensive damage in Balochistan. He also noted that floodwaters entering from Sindh through the Norwa route had previously caused destruction in several areas of the province.
The Superintending Engineer directed the relevant authorities to take all necessary measures to protect local communities and agricultural land. He warned that any move that could divert rain or floodwaters towards Balochistan’s populated areas would not be tolerated and that no compromise would be made on the protection of lives and property.


