Over Rs112m in disclosed investment covers heatstroke centre, 50,000-gallon water reservoir, Nari Headworks rehabilitation, university and DHQ Hospital facilities; Karak water supply scheme also underway
SIBI (6 AM Report): Multiple development projects have been launched or are under construction in Sibi under Phase III of the Balochistan Special Development Initiative (BSDI) to improve healthcare, drinking water, irrigation and educational infrastructure, with the disclosed cost of the schemes exceeding Rs112 million, excluding the Karak water supply project for which no cost has been specified.
Commandant Sibi Scouts Colonel Munir Ahmed Sultan and Deputy Commissioner Sibi Major (retd) Ilyas Kibzai inaugurated and inspected projects at different locations, directing concerned authorities to ensure construction quality and complete the schemes within stipulated timelines.
Rs10m Heatstroke Centre Being Established in Talli Village
A Rs10 million heatstroke centre is being established in Talli village to provide timely medical assistance to residents during extreme heat and heatwaves. The facility will include solarization, lithium batteries, an overhead water tank, fans, electric motor and air-conditioners.
In Khajjak village, a Rs25 million, 50,000-gallon overhead water storage reservoir is being constructed to improve the supply of clean and safe drinking water to around 3,000 residents. The existing storage tank has become old and is considered inadequate for the needs of the growing population.
Work has also started on a water supply scheme in Karak village, involving desilting of a raw-water tank and improvement of water storage arrangements. Water will be stored and supplied through a pipeline to an overhead tank to improve local drinking water availability. The cost of this scheme was not specified in the official information.
Rs18.231m Nari Headworks Rehabilitation Project Launched
At Nari Gauge, a Rs18.231 million project has been launched for rehabilitation of the Nari Headworks weir and protection bund. The scheme is aimed at improving water diversion and flow management, providing greater protection against flood damage and ensuring a more reliable irrigation supply to the 97,864-acre command area.
At Mir Chakar Khan Rind University Sibi, two projects costing a combined Rs45 million are under construction. These include a Rs35 million waiting hall equipped with a 20kW solar system and six air-conditioners, and a Rs10 million parking shed with tuff tiles and capacity for around 50 vehicles.
Another Rs14 million worth of projects is under construction at DHQ Hospital Sibi. A modern mortuary is being built at a cost of Rs10 million with solar power, air-conditioners, lithium batteries and other facilities, while Rs4 million is being spent on marble and tile installation over an area of 7,575 square feet.
No Compromise on Quality, Timely Completion of Projects: Officials
Colonel Munir Ahmed Sultan and Major (retd) Ilyas Kibzai directed concerned departments to make no compromise on construction quality and ensure timely completion so that communities could benefit from the health, education, drinking water and irrigation schemes at the earliest.



2 Comments
Pingback: 57 Chickenpox Cases Reported in Harnai Village, Health Teams Mobilized - Daily 6AM
Pingback: Step Up Forest Protection, Tree Plantation: Commissioner Sibi - Daily 6AM